Results From Changes in The Pole of 15 kV Power Transmission Lines
DOI:
https://doi.org/10.14464/ess.v9i1.509Abstract
Baganuur Southeast Electricity Distribution Network 15 kV electrical transmission line interruptions research was conducted, and a factor analysis was performed to determine the conditions of the line outage. Due to the neutral grounding of the 15 kV electrical transmission line and the relatively small distance between the line wires and crossbar, there is a high incidence of grounding during the landing and flight of birds, which hurts the reliable operation and ecology of the line. Therefore, the structure of the poles changed, and the results are reflected.

Downloads
Published
Issue
Section
License
Copyright (c) 2022 Battulga Munkhbaatar, Bold S., Bat-Erdene B., Tuvshinzaya G., Zagdkhorol B.

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright for articles published in this journal is retained by the authors. The content is published under a Creative Commons Licence Attribution 4.0 International (CC BY 4.0). This permits use, distribution, and reproduction in any medium, provided the original work is properly cited, and is otherwise in compliance with the licence.